Projects

Dorm Reno (Riley)

Construction: MILCON, DB, Horizontal Build, Repair/Renovation/FSRM, Decon/Demo, Waste Removal

Logistics & Procurement: Oversight of Pricing, Ordering & Delivering of Supplies & Equipment, Supply Chain Chain Management, Cost Control

RELYANT performed the $7.6M Design-Build (DB) repair and renovations to the 16,455 SF Buildings on Fort Riley, Kansas in support of the USACE Kansas City District. Renovation included, but is not limited, to ceilings, walls, floor coverings, framing, interior and exterior doors, windows, and the replacement of new and modified HVAC and plumbing systems and new electrical systems to include fire alarm. Selective demolition was performed to design and construct new spaces. RELYANT integrated existing utility systems and selected systems based on their low-cost and ease of maintenance and operation. RELYANT also incorporated sustainable and effective lifecycle design solutions to include energy efficient water heating, electrical power, lighting, and other equipment systems.